Edenbridge Culvert Emergency Re-Lining

Edenbridge Culvert Emergency Re-Lining

Emergency works to propose a solution to strengthen the structure and prevent any closures of the track. Kaymac proposed to install a weholite HDPE liner through the structure and then fill the annulus with micro concrete.

DCL/40 Cherwell Scour Protection

DCL/40 Cherwell Scour Protection

The project was part of a Network Rail CP5 programme of works to upgrade infrastructure along the LNW route and where possible, enhance structures to higher specifications and standards. Kaymac were contracted by Story Rail to carry out the Scour Protection works to DCL/40 Cherwell.

Llwyd Bridge Scour Protection

Llwyd Bridge Scour Protection

Fedw Llwyd Bridge was subject to significant scour damage, and needed to be repaired and made safe quickly.

Lock Gate Removal

Lock Gate Removal

Phase 1 of the lock gate removal at Swansea Dry Docks has been successfully completed. Kaymac were instructed to un-step the existing lock gates and transport them within the operational dry dock so that essential repair works could be carried out.

Jane's Creek Bridge Strengthening Project

Jane's Creek Bridge Strengthening Project

The bridge structure was deemed unsafe following investigation due to rotation and movement; the structure required stabilisation. The works comprised of Bridge Strengthening works including insitu concrete to invert, 42m long ground anchors and all associated temporary works.