News
Testimonials

Paul Retallick,Team Leader – Bridges and Structures, Swansea City Council.

Swansea Council were extremely impressed with the professionalism and efficiency demonstrated by Kaymac Marine Limited during the recent Morfa culvert repair project. From the outset, their team showcased a deep understanding of the challenges involved and delivered a solution that was both technically sound and cost-effective.The project was completed on time and under budget, which is a testament to their meticulous planning, skilled workforce, and commitment to excellence. Their communication throughout was clear and proactive, ensuring all stakeholders were kept informed and aligned.

Thanks to Kaymac Marine’s expertise, the culvert is now fully operational and structurally sound, with minimal disruption to the surrounding area. We would not hesitate to recommend them for future marine infrastructure works.

Morfa Culvert Repair

Kaymac provided an excellent and reliable service throughout the whole project. The Communication between everyone on site was continuous which ensured clarity with all staff members. The Kaymac team had a great understanding of the project as a whole particularly with the safety and site-specific tasks that were required, and as a result, the project was very successful.

Peter Curry, Hull City Council
Hull Marina Lock Gate Maintenance

Kaymac are always the go-to solution for my diving requirements.

Andy Harries, Wessex Water
Fantastic Service!

Kaymac have supported the BPC now for over 20 years and continue to provide a top service on planned and unplanned work, always flexible around the tides as well.

Ian Russ, Port Engineer, Bristol Port Company.
De-silting and Diving Inspections

Kaymac have been an integral part of the project team, their input into problem-solving through developing options and temporary works solutions has been valuable in overcoming challenges. The Kaymac team are very knowledgeable when it comes to marine civils, highlighting risks and developing methodologies. When working on site the team from Kaymac are professional, helpful, and positive, and they carry out their works safely and diligently, which have included specific safe systems of work including diving and confined space working. Their quality management & handover processes are also robust and proactive.

Alex Gentleman, Project Manager, Balfour Beatty TEAM2100
Tilbury Dual Function Lock Gates, Pintle Replacement

“Kaymac have always provided an excellent, economic, efficient and effective service. They have delivered quality workmanship, safely, to programme and within available budget. They were easy to work with on site and the final account was settled amicably, with no disputes. I will look forward to working with them again.”

Gordon Randlesome BSc(Hons), C.Eng, MICE. Principal Engineer, Swansea Council
Tawe Barrage Lock Gate Maintenance