Aberthaw Power Station Sea Defence

Aberthaw Power Station Sea Defence

The Sea defence groynes (Breakwater) at Aberthaw Power Station were severely damaged and required repair.

The groynes play an important role in maintaining sand levels on the beach to reduce the impact of the waves on the sea walls, protecting this area from flooding. Kaymac’s civils division were contracted to repair the various missing and damaged timer groins, break out various existing undercut concrete sections and repair the Sea Walls by mass concrete repair operations.

At the required locations the seawall was repaired using modular formwork and concrete.

The project was delivered on time and to budget.