Cobb Valley Culvert Flow Control Project

Kaymac did an excellent job. Rhys Colcombe (Senior Project Engineer) more specifically was excellent very engaging and efficient. I would definitely use KAYMAC again if the opportunity arose.

Ruth House, Project Manager, Network Rail

Pembroke Power Station, foam reduction survey

A very good outcome to a challenging problem- both on the organisational side and the operation itself.

James Cheryl, Technical Director, ACE Ltd.

Bath Corridor, Confined Space Construction

Very good communication from the ECI stage of works meant we were able to discuss the feasibility of the designs by others and feedback in order to make the design work in a difficult environment. I have recommended Kaymac to the wider company for consideration on future tenders/projects.

Gareth Griffiths, Project Engineer, Hochtief

Oldbury Power Station, Culvert Sealing

I was extremely impressed with how the guys worked together to safely deliver the successful completion of the project.

Scott Ansey, Site Engineer, Magnox

Carrington Fluvial Erosion Asset Protection Project

The Kaymac works, once started went smoothly and without any delay (helped by the favourable weather conditions) and the works were delivered well within the expected programme duration and contributed to the achievement of our ‘Perfect Delivery’ of the Project to our client. With the above comments in mind, I am not sure that the works could have been done much better. I would have no hesitation in recommending Kaymac Marine and Civil Engineering for consideration for any works that may come up in the future.


Peter Koumas, Managing Quantity Surveyor. Morgan Sindall

Installation of Lock Gates, Swansea Dry Dock

We’ve had a great working relationship with Kaymac and I would recommend them to any marine business.

Damian Lloyd, HSEQ Manager, Swansea Drydocks Ltd