Fedw Llwyd Bridge

Fedw Llwyd Bridge

Fedw Bridge was subject to severe scour damage and undermining and required concrete repairs to make safe.

Jane's Creek Bridge Strengthening Project

Jane's Creek Bridge Strengthening Project

The bridge structure was deemed unsafe following investigation due to rotation and movement; the structure required stabilisation. The works comprised of Bridge Strengthening works including insitu concrete to invert, 42m long ground anchors and all associated temporary works.

Aberthaw Power Station Sea Defence and Groyne Repair Project

Aberthaw Power Station Sea Defence and Groyne Repair Project

The sea defences at Aberthaw Power Station site were constructed during the mid-1950’s.  They comprise a perimeter sea wall, a series of groynes, and a revetment along the banks of the River Thaw.   The sea wall surrounds the south and west sides of the site and comprises a site cast concrete gravity retaining wall. The front of the wall has a concave face to deflect waves and stands approximately…

Llandanwg Culvert Repairs

Llandanwg Culvert Repairs

Structural surveys identified that Llandanwg Culvert was structurally unsafe and required repair. To make the structure safe, a confined space team was required to rake out and reseal fractures to the barrel and wing walls.

Cartlett Brook Rail Embankment Scour Repair and Protection

Cartlett Brook Rail Embankment Scour Repair and Protection

Following investigation, it was identified that there was approximately 5.5m in length scour occurring to the earth embankment adjacent to the culvert; the culvert headwall and wing walls were also in relatively poor condition.