Llyn Teifi Reservoir Spillway Rehabilitation

Llyn Teifi Reservoir Spillway Rehabilitation

The Teifi dam spillway is under the Reservoirs Act 1975, this Act requires reservoirs to be under supervision at all times and periodically inspected by specialist qualified civil engineers. As a result of one of these inspections concerns were highlighted about the stability and deterioration of the concrete due to freeze/thaw action over many years. Therefore the need for refurbishment work was identified.

Carrington Fluvial Erosion Project

Carrington Fluvial Erosion Project

Commissioned by Morgan Sindall, Kaymac co-ordinated the design and installation of a scour protection solution that would protect the existing National Grid high voltage overhead tower from erosion and subsequent collapse through the flows of the River Mersey. The project involved the placing of approximately 6000t of D50 rock armour within and along the banks of the River Mersey.

Radyr Weir Penstock Installation and Pile Removal

Radyr Weir Penstock Installation and Pile Removal

Kaymac were commissioned by Dawnus Construction Ltd to install a controlled water flow system to sheet pile cofferdam. Once installed and works required our team of divers for cutting and burning of piles for removal by crane.