Prioress Mill Pumping Station

Prioress Mill Pumping Station

To propose and install temporary works solution and carry out site investigation within the watercourse of the River Usk.

Wimbleball Destratification Line Installation

Wimbleball Destratification Line Installation

To supply and install a replacement destratification system to the original specifications

Durleigh Reservoir- Installation of Exclusion Boom

Durleigh Reservoir- Installation of Exclusion Boom

Installation of a Bolina Safety Boom on Durleigh Reservoir to create an exclusion zone for the safety of canoeists and other water activities

Lower Lleidi Reservoir Spillway Repair

Lower Lleidi Reservoir Spillway Repair

To carry out low pressure grouting and re-pointing works to the spillway masonry walls and invert.

Wye Transfer Intake Screens

Wye Transfer Intake Screens

The existing Welsh Water intake structure at Wye Transfer was to be upgraded to accommodate 2 new Hydrolox screens. To install the designed steel support system, the existing structure required adaptation, which was carried out through diving operations.