Client: Wessex Water Duration: 2 weeks

Diving works; Inspections, Repair and Installation, plant and materials necessary to install Bolina safety Boom.


Kaymac have been commissioned by Wessex water to install a Bolina Safety Boom on Durleigh Reservoir to create an exclusion zone for the safety of canoeists and other water activities on the reservoir.

The works involved the provision of a 4 man team to assemble the Bolina Boom ashore, the provision of a 4 man team to install Bolina Boom as directed by Bolina Booms staff, a manned safety/work boat, jet float pontoons to position 3 number 300kg anchors, and offloading equipment.

 

 

 