Case Study Archive
October 2011
Parrog Outfall Installation
Kaymac Marine & Civil Engineering were commissioned by Morgan Sindall Plc to assist with Early Contractor Involvement to aid in the design and installation of a new 642m long outfall pipe in the Village of Parrog, Pembrokeshire. Read MorePembroke Power Station Cofferdam Installation & Removal
Kaymac Marine & Civil Engineering Ltd was commissioned by RWE npower to design, install and then later remove a cofferdam system to seal the cooling water intakes to the former Pembroke Power Station, which was constructed between 1965 and 1968 and stopped generating electricity in 1997. Read MoreConwy Tubular Bridge
Kaymac Marine & Civil Engineering Ltd was commissioned by Birse Rail to carry out works to remove two existing inspection gantries from the Conwy tubular railway bridge. Read MoreDutton Viaduct
Kaymac Marine and Civil Engineering Ltd were commissioned by Birse Rail to carry out scour protection works to the two spans of the viaduct which now carry the railway over the Weaver Navigation. Read MoreShowing 1 - 4 of 4 Articles
1