Case Study Archive

October 2011

Parrog Outfall Installation

Parrog Outfall Installation

Kaymac Marine & Civil Engineering were commissioned by Morgan Sindall Plc to assist with Early Contractor Involvement to aid in the design and installation of a new 642m long outfall pipe in the Village of Parrog, Pembrokeshire.
Read More
Pembroke Power Station Cofferdam Installation & Removal

Pembroke Power Station Cofferdam Installation & Removal

Kaymac Marine & Civil Engineering Ltd was commissioned by RWE npower to design, install and then later remove a cofferdam system to seal the cooling water intakes to the former Pembroke Power Station, which was constructed between 1965 and 1968 and stopped generating electricity in 1997.
Read More
Conwy Tubular Bridge

Conwy Tubular Bridge

Kaymac Marine & Civil Engineering Ltd was commissioned by Birse Rail to carry out works to remove two existing inspection gantries from the Conwy tubular railway bridge.
Read More
Dutton Viaduct

Dutton Viaduct

Kaymac Marine and Civil Engineering Ltd were commissioned by Birse Rail to carry out scour protection works to the two spans of the viaduct which now carry the railway over the Weaver Navigation.
Read More

Showing 1 - 4 of 4 Articles